SIGNED ROUTE/STREET NAME: MONTANA 24, MONTANA 42 PROJECT DESCRIPTION: Located along MT Highway 24 northwest of Fort Peck enroute to Glasgow and is 13.8 miles in length. The project includes pulverization of the existing surface followed by a new overlay, widening of the roadway to include 2-foot shoulders, chip seal, rumble strips, upgraded signing and pavement markings. Additionally, guardrail end sections will be updated, and any incorrectly installed rail will be repaired or reset.
IMPORTANT UPDATE ABOUT TICKETS "Screenshots" or photos of tickets & computer screens will no longer be allowed. You will need to show a printed ticket or the acutal pdf. from the TicketPeak email. If you arrive with only a photo on your phone, the Ticket Checkers will send you to the Box Office to verify your ticket information. Again, no photos.
Thank you for understanding. If you have questions, please call 406.228.9216
Search
Theatre Project Highlight in Glasgow Courier
fptheatre
Oct 6, 2024
1 min read
The Glasgow Courier featured highlights and projects from the Fort Peck Summer Theatre.
Comments